Marimba construction

Here you can see the individual production steps:

  • Der Trockenraum wird mit ca. 3 cm Wasser befüllt.

  • The drying room is filled with approx. 3 cm of water. The raw wood is now slowly dried down.

  • The dried boards are roughly sawn.

  • Here you can see the frame production.

1 of 14